Download a PDF of this document

Mean Time Between Failure (MTBF) Data Analysis of UPS

Equipment at the Exxon Chemical Plant in Baton Rouge, Louisiana

Abstract

The data provided by Exxon's maintenance personnel covered a time span of 11 years, from 1978 through 1989. Twenty-three UPS systems, all manufactured by Solidstate Controls Inc, were included in the database. Each system consisted of a charger, inverter, Static bypass switch, mechanical bypass switch, and a 60-cell battery.

The 23 systems were installed at different times and the total accumulated run-time hours reflect this. The total accumulated time over the eleven years was 1,252,680 hours (143 years).

Referring to page 3, each failure has been tabulated chronologically with the oldest failures starting at the bottom. The dates shown in parenthesis (e.g. '81) are the installed date for that system. The annotation (T/A) refers to a failure that occurred during a maintenance period. In a refinery, maintenance is permitted only during scheduled intervals called "turn-arounds". These turn-around intervals usually are two or three years.

Some of the failures were due to external causes such as water damage, fire, or explosion. These are noted as external causes.

Analyzing the failures starting on page 3

36 items are listed, but the item described as high audible noise was not counted as a failure.

Of the 35 items remaining, 11 were battery failures, so the remaining equipment failures were 24 items. Looking at these 24 items, 11 failures occurred either during a turn-around or from external causes. Thus we are left with 13 bona fide UPS equipment failures that occurred while the refinery loads were running.

Breaking down these 13 failures, two involved the chargers, eight involved the inverters, and three involved the static switches.

MTBF by definition is the total running hours divided by the number of failures. Looking at the three major sections of a UPS system, the MTBF can be stated as follows:

Chargers 1,252,680 hours = 626,340 hours/failure
2 failures

Inverters 1,252,680 hours = 156,585 hours/failure
8 failures

Static Switch 1,252,680 hours = 417,560 hours/failure
3 failures

It should be noted that it is a common practice in the UPS industry to state in the sales literature an MTBF number based solely on the static switch. This so called mission MTBF is defined as the number of hours between loss of power to the critical load. Under this definition the inverter could fail once a day, but as long as the static bypass is available, no power interruption to the critical load occurs. Mission MTBF ignores the loss of availability of the static bypass and hides the failures of the inverter and charger.

Solidstate Controls believes that the MTBF for each major UPS section should be stated independently and should be based on actual field data rather than the theoretical calculations described in the military standard, MIL-217F, which is often the basis for published MTBF numbers.

The MTBF for the ferroresonant inverters is particularly noteworthy since it is 2-3 times higher than inverters using pulse-width or step-wave technology. The simple, rugged design of our inverters is reflected in the field data supplied to us by Exxon.

Incidents

Years in Service/System # of Units in Service

0 AROM _________C 805 SHTS (81)

APCC _________LOOSE SCR/WIRING (Å86)

BELA-5#1 _________D.C. INPUT FUSE (Å87) 23

NEO ACID _________STAT. SW. PCB (Å88)

NEO ACID _________BATTERY- OFF GAS (Å88) PWR

SACC #1 _________B.C. CONTROL PCB (Å88)

1 8 PLA _________BATTRY CAPCTY TEST FAIL (Å86) EXIDE

NACC#l _________BATTÅRY FAIL (188) GNB

SACC #2 _________BATTRY OVERHEAT (88) GNB 22

RLA #1 _________BATTÅRY RECALL (Å87) PWR

2 BELA-5 #1 _________BATTÅRY FAIL (87) PWR (T/A)

BELA-5 #2 _________BATTERY FAIL (Å87) PWR (T/A)

IPCC #1 _________MBS LOCKED UP (Å80) (T/A) 21

IPCC #2 _________SCR FAIL-INV. ('80) (T/A)

RLA-1 _________BRÅKR TRIP - D.C. DISQBRKÅR (Å87)

3 APCC _________LOW DC DISC. (Å86) 17

4 POX _________ST. SW. SCR,- FUS (Å78) 14

5 IPCC #1 _________3 rd- HARM CHK (Å80) (T/A)

SACC COMPR _________ST. SW. PCB (Å80) 12

6 NACC Comp.Ca ________ ALT. SRC ALARM PCB (Å80)

SACC Compr _________ALT. SRC ALARM PCB (Å80) 12

7 IPCC #2 _________MBS LOCK -UP (Å80) (TYA)

0X0-NRTH _________BATRÅRY FAILED CAPÅCITY TEST (Å80) C&D 12

POX _________FU 2,4,5 BLEW ('78)

8 AROM _________C 805 SHRTÅD (Å81) extemal cause

AROM _________BATPRY CELL FAIL ('81) EXIDE 10

PALA _________B.C. ALARM PCB (Å80)

9 IPCC #1 _________HIGH AUDIBLE NOISE (Å80)

IPCC #2 _________BATTRY FAIL (Å80) EXIDE

PALA _________C 1 CAPC. OPEN (Å80) exterral cause

PALA _________C 805 CAPC. LEAKS (Å80)

POX _________SCR SHRT'G PCB- WATER IN UNIT ('78) external cause

SACC COMPR _________MBS LOCK-UP (Å80) (T/A) external cause

SACC COMPR _________OSC. PCB RELAY (Å80) (T/A)

10

11 POX _________CRKÅD BATTERY CELL; GND

_________DETCT PCB (Å78) external cause